CURRENT SAMS BOIP/LIN/NSN/DESIGNATOR
SYSTEM: SAMS-1E (V1)
BOIP: Q073-AA-S
SLIN: C18446
NSN: 7010-01-538-5103
DESIGNATOR: AN/TYQ-139, COMPUTER SYSTEM, DIGITAL
SYSTEM: SAMS-1E (V2)
BOIP: O044-AA-S
SLIN: C28078
NSN: NSN: 7010-01-538-8604
DESIGNATOR: AN/TYQ-140, COMPUTER SYSTEM, DIGITAL
SYSTEM: SAMS-2E (V2)
BOIP: O045-AA-S
SLIN: C18718
NSN: 7010-01-538-4822
DESIGNATOR: AN/TYQ-141, COMPUTER SYSTEM, DIGITAL
Current SAMS-1E and SAMS-2E System Configurations V1 and V2
SAMS-1E:
V1 System (Replaces old ULLS-G System)
(1 EA) COMPUTER SET, DIGITAL (Notebook w/Transit Case)
(1 EA) 4 PORT SURGE SUPPRESSOR (110VAC)
(1 EA) 25 FT CAT5 LAN Cable
(1 EA) PRINTER, LASER & Transit Case
(1 EA) 6 FT USB A-B Printer Cable
SAMS-1E:
V2 System (Replaces old SAMS-Rehost System)
(2 EA) COMPUTER SET, DIGITAL (Notebook w/Transit Case)
(2 EA) 4 PORT SURGE SUPPRESSORS (110VAC)
(2 EA) 25 FT CAT5 LAN Cable
(1 EA) PRINTER, LASER & Transit Case
(1 EA) 6 FT USB A-B Printer Cable
(1 EA) 8 PORT Switch (10/100)
(1 EA) 100 FT CAT5 LAN Cable
SAMS-2E:
V2 System (Replaces old SAMS-2 V2 System)
(2 EA) COMPUTER SET, DIGITAL (Notebook w/Transit Case)
(2 EA) 4 PORT SURGE SUPPRESSORS (110VAC)
(2 EA) 25 FT CAT5 LAN Cable
(1 EA) PRINTER, LASER & Transit Case
(1 EA) 6 FT USB A-B Printer Cable
(1 EA) 8 PORT Switch (10/100)
(1 EA) 100 FT CAT5 LAN Cable
Information for PBO’s
Currently the NSN’s for the new SAMS-E hardware being fielded are not yet published in the
SB700-20, as a result, SLAMIS has assigned a Master NSLIN (FJ103L) until the update of the
SB. Property Book Officers and NCOs should take some unique steps to place their new
SAMS-E equipment on the property book as a substitute NSLIN to the SLIN authorized on their
MTOE/TDA as follows:
Accounting for SAMS-E on the Property Books:
System-----Nomen---------------------------SLIN---NSLIN--NSN------------
SAMS-1E V1 Computer System, Digital AN/TYQ-139 C18446 FJ103L 7010-01-538-5103
SAMS-1E V2 Computer System, Digital AN/TYQ-140 C28078 FJ103L 7010-01-538-8604
SAMS-2E V2 Computer System, Digital AN/TYQ-141 C18718 FJ103L 7010-01-538-4822
NOTE: As of this publishing of this documnent we did not address the V5 configuration
(7010-01-538-4231) because there has not been a SLAMIS NSLIN assigned to this NSN yet.
Before posting, the PBO‘s will first need to select the appropriate NSN as shown from the NSLIN
Master Catalog (shown on next page). This will add the NSN to the selected User Catyalog by INS.
Once these NSN‘s have been added to the User Catalog, an Asset Adjustment (Increase) transaction for
the SUBLIN can be posted.
Upon receipt of SAM-E computers, conduct inventory, visual inspection of goods and serial number
verification of SAMS-E computers with (DA Form 3161) which is provided by Program Executive Office,
Enterprise Information Systems (PEO EIS), Operations, Contracts and Logistics (OCLD), System
Extension and Acceptance Team (SEAT) personnel. Once the inventory and inspection is completed,
process the Asset Adjustment (Increase) transaction to post the receipt.
Army Network Security Requirements for SAMS-E
Fielded in compliance with two Army Network Security
Programs
DOD Information Assurance Certification and Accreditation Process
- DIACAP)
Information Assurance Vulnerability Alerts (IAVA)
• DIACAP
Authority to Operate (ATO) on Army Networks Worldwide
ATO approved by PEO EIS, the Designated Approving Authority
(DAA)
• IAVA
PM LIS Information Assurance Site on AKO displays approved
IAVA patches:
https://www.us.army.mil/suite/page/101760IAVA patches must not be loaded on PM LIS Managed
Systems until the Configuration Manager has tested them for
compatibility and posted approval to the AKO Site
• This information should be passed on to the Installation
DOIM where applicable:
PM SAMS-E POC for DIACAP/IAVA information is Mr. Mark
Van Gundy , IASO,APM-ALIS,Fort Lee VA, Tel (804) 734-6655
DSN 687-6655
Additional Information is also found in the FAQ section of the
MOA and on the PO SAMS-E AKO web page.
Deployment Phase - Hardware Extension
• Hardware equipment arrives on post and is placed
in a secure area
• Equipment is inventoried and issued to PBO’s
prior to the start of training (User equipment
should not be Played With by anyone until it is
actually brought in for Data Conversion)
• Users must bring new systems and their old data
and old reports to the Data Conversion Site
• CSSAMO, Managers and Operators execute Data
Conversion and set up systems
• Users return to their units with new SAMS-E
systems fully operational
SAMS-E Software and Hardware Maintenance Support
How is it Handled?
For Legacy Systems
• With the Old Legacy (SAMS and ULLS-G) Systems –
If you had a software problem you called CAO at Ft Lee.
If you had a Hardware problem, it depended on the type of
Hardware you had.
For SAMS-E
• Both Hardware and Software problems are reported to the
PM LIS Regional Army Support Center (RASC) at :
1-866-547-1349 or 254-618-8619 (DSN) 259 8619
Email address:
[email protected]Hardware Warranty is currently 3 Years On-Site
Mr. Andy Anderson
DSN 656-4018
Comm 703-806-4018
[email protected]Mr. Ken Lafayette
DSN 656-3102
Comm 703-806-3102
[email protected]Source:
http://www.gordon.army.mil/dpw/logistic ... oncept.pdf